{"id":1818,"date":"2021-10-14T14:40:29","date_gmt":"2021-10-14T21:40:29","guid":{"rendered":"https:\/\/news.venturacounty.gov\/?p=1818"},"modified":"2022-06-08T16:33:31","modified_gmt":"2022-06-08T23:33:31","slug":"county-of-ventura-brings-3mw-solar-array-online-in-fillmore","status":"publish","type":"post","link":"https:\/\/news.venturacounty.gov\/en\/county-of-ventura-brings-3mw-solar-array-online-in-fillmore\/","title":{"rendered":"County of Ventura Brings 3MW Solar Array Online in Fillmore"},"content":{"rendered":"\t\t<div data-elementor-type=\"wp-post\" data-elementor-id=\"1818\" class=\"elementor elementor-1818\" data-elementor-post-type=\"post\">\n\t\t\t\t\t\t<section class=\"elementor-section elementor-top-section elementor-element elementor-element-a120d61 elementor-section-boxed elementor-section-height-default elementor-section-height-default\" data-id=\"a120d61\" data-element_type=\"section\" data-e-type=\"section\" data-settings=\"{&quot;jet_parallax_layout_list&quot;:[]}\">\n\t\t\t\t\t\t<div class=\"elementor-container elementor-column-gap-default\">\n\t\t\t\t\t<div class=\"elementor-column elementor-col-100 elementor-top-column elementor-element elementor-element-f96f3c0\" data-id=\"f96f3c0\" data-element_type=\"column\" data-e-type=\"column\">\n\t\t\t<div class=\"elementor-widget-wrap elementor-element-populated\">\n\t\t\t\t\t\t<div class=\"elementor-element elementor-element-f80e0b4 elementor-widget elementor-widget-text-editor\" data-id=\"f80e0b4\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<p style=\"text-align: right;\"><span style=\"color: #373737; font-family: Helvetica, Arial, FreeSans, sans-serif; font-size: 12px;\"><strong>Download article:<\/strong> <a title=\"Press Release - English\" href=\"https:\/\/vcportal.ventura.org\/CEO\/VCNC\/press_releases\/2021-10-14_vcnc_pr_fillmore-solar-panel-array.pdf\" target=\"_blank\" rel=\"noopener\">English<\/a> | <a title=\"Press Release - Spanish\" href=\"https:\/\/vcportal.ventura.org\/CEO\/VCNC\/press_releases\/2021-10-14_vcnc_pr_fillmore-solar-panel-array_sp.pdf\" target=\"_blank\" rel=\"noopener\">En espa\u00f1ol<\/a><\/span><\/p><p>Ventura, CA \u2013 The County of Ventura General Services Agency in partnership with Ventura Solar, LLC brought a new off-site solar panel array installation, located in Fillmore, online in September. Slated to provide 3 megawatts of electricity for County facilities at a reduced rate, the solar array is located at 67 E. Telegraph Road, Fillmore, at a former superfund site that was repurposed into the current 3-MW solar photovoltaic system, consisting of more than 11,000 solar panels and estimated to reduce more than 2,000 metric tons of greenhouse gas emissions, or a 5% reduction, annually, from the County\u2019s operations. This equates to an estimated annual savings of $100k, or a total estimated savings between $3.9 and $5.4 million over the life of the 25-year agreement with Ventura Solar.<br \/><br \/>\u201cThis project is an excellent example of the County\u2019s commitment to environmental sustainability and also the creative solutions that are possible when government partners with private industry,\u201d said David Sasek, Director of the County of Ventura General Services Agency. \u201cGSA worked closely with Ventura Solar, LLC to develop this 3MW solar field which didn\u2019t require any investment on the part of the county but will save the County approximately $100,000 per year on our electric bills while providing significant portion of our electricity in the form of clean solar power.\u201d<\/p><p>The project was initially formed under the Southern California Edison Renewable Energy Self-Generation Bill Credit Transfer (RES-BCT), a program that allows local governments to generate renewable energy from one generating account for bill credits that are applied to benefitting accounts. The installation was completed without incurring any capital costs to the County, carries a 7-year minimum commitment, and allows for an additional 5-year extension at the end of the 25-year contract.<\/p><p>\u201cBringing this project online is consistent with a number of the County\u2019s goals including those in the General Plan that call for the County to be a regional leader in energy efficiency, minimize energy consumption, and promote the development and use of renewable energy resources,\u201d said Alejandra T\u00e9llez, Sustainability Officer, County of Ventura Sustainability Division.<\/p><p>The long-term owner of the project has recently transferred from Ventura Solar to Ecopower, and the County of Ventura GSA looks forward to an exciting partnership with the Ecopower group. The system officially reached its commercial operation date on September 14, 2021 and is now drawing power. A formal ribbon-cutting ceremony will be scheduled for early in 2022.<\/p><p>For more information, please contact David J. Sasek at (805) 654-3800.<\/p><p><img decoding=\"async\" style=\"width: 600px; align: left;\" src=\"https:\/\/vcportal.ventura.org\/CEO\/VCNC\/press_releases\/2021-10-14_vcnc_pr_fillmore-solar-panel-array_pic01.jpg\" alt=\"\" \/><\/p><p><img decoding=\"async\" style=\"width: 600px; align: left;\" src=\"https:\/\/vcportal.ventura.org\/CEO\/VCNC\/press_releases\/2021-10-14_vcnc_pr_fillmore-solar-panel-array_pic02.jpg\" alt=\"\" \/><br \/>Photo credit: Solar array field at 67 E. Telegraph Road, Fillmore<\/p>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t<\/section>\n\t\t\t\t<\/div>\n\t\t","protected":false},"excerpt":{"rendered":"<p>Download article: English | En espa\u00f1ol Ventura, CA \u2013 The County of Ventura General Services Agency in partnership with Ventura Solar, LLC brought a new off-site solar panel array installation, [&hellip;]<\/p>\n","protected":false},"author":5,"featured_media":1819,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_mo_disable_npp":"","footnotes":""},"categories":[6],"tags":[],"class_list":["post-1818","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-news"],"_links":{"self":[{"href":"https:\/\/news.venturacounty.gov\/en\/wp-json\/wp\/v2\/posts\/1818","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/news.venturacounty.gov\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/news.venturacounty.gov\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/news.venturacounty.gov\/en\/wp-json\/wp\/v2\/users\/5"}],"replies":[{"embeddable":true,"href":"https:\/\/news.venturacounty.gov\/en\/wp-json\/wp\/v2\/comments?post=1818"}],"version-history":[{"count":0,"href":"https:\/\/news.venturacounty.gov\/en\/wp-json\/wp\/v2\/posts\/1818\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/news.venturacounty.gov\/en\/wp-json\/wp\/v2\/media\/1819"}],"wp:attachment":[{"href":"https:\/\/news.venturacounty.gov\/en\/wp-json\/wp\/v2\/media?parent=1818"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/news.venturacounty.gov\/en\/wp-json\/wp\/v2\/categories?post=1818"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/news.venturacounty.gov\/en\/wp-json\/wp\/v2\/tags?post=1818"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}